Well,
As soon has I get the pitman arm puller I will be done, all I lack is switching pitman arms and installing the radiator.
The pump is in and bolted, the bracket bolt spacers are welded in place as required. The is pump reservoir has been located and bolted with all hoses cut to size, and securely hooked up, the pulley is bolted in place - with belt on- and in great alignment.
It's all painted - Its done except to switch the the pitman arm, add fluid and install radiator.