no offense taken- --at all
they are oversize; I had them shipped to m on my own account, 93 bucks.
Additionally, I went to run them at the Zuwharrie event and realized they had pins instead of sleeves(like when you mod the stock doors)...so I could not even hang them on my cut hinges.
You may not be cheap, but zukkers are in general.(not a bad thing). Although in the same breath you said you want to keep cost down, lol.
I am busy with my regular canvas work, atm, so still unsure as to how long to build once I get them rolling.
I have bought steel and made jig to bend.
Some other soft goods in the works as well.
I actually think that I will end up making them 2 piece; upper/lower, as it would help the shipping issue and give added benefit.
...eventually